DSSSB · Mathematics

P can do a piece of work in 14 days and R can do 50% of the same work in 10.5 days. Then in how many days P and R working together complete the same work?

  1. 8.8
  2. 8.4
  3. 6.5
  4. 7.2
Answer and detailed solution are available in the protected study screen.
Register or login to attempt